Gold Member Since 2015
Audited Supplier
Shandong Dubang International Trading Co., Ltd.

Galvanized Steel Coil, Steel Coil, Galvanized Coil manufacturer / supplier in China, offering HDG Galvanized Steel Coil Per SGCC, PPGI with High Quality Export to Hongkong, Galvanized Steel Pipe /Galvanized Steel Tube/Galvanized Conduit/Zn Coated-25 and so on.

(/ )

Supplier Homepage Product Galvanized Steel Coils HDG Galvanized Steel Coil Per SGCC

HDG Galvanized Steel Coil Per SGCC

Purchase Qty.:
(Tons)
25-99 100-199 200-299 300-499 500+
FOB Unit Price: US $620 US $600 US $580 US $560 US $530
Purchase Qty. (Tons) FOB Unit Price
25-99 US $620
100-199 US $600
200-299 US $580
300-499 US $560
500+ US $530
Get Latest Price
Port: Qingdao, China
Production Capacity: 3000 Ton Per Month
Payment Terms: L/C, T/T, D/P

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Standard: ASTM, JIS, AISI, BS
  • Certification: SGS
  • Technique: Cold Rolled
  • Edge: Slit edge
  • Width: 914, 1000, 1200, 1219, 1220, 1250mm
  • Thickness: 0.14mm to 1.5mm
  • Coil ID: 508mm/610mm
  • Transport Package: Standard Seaworth Package
  • Origin: China
  • Steel Grade: Q235
  • Surface Treatment: Galvanized
  • Application: Boiler Plate
  • Stock: Stock
  • Zinc Coating: 40-150GSM
  • Spangle: Zero, Small, Regular,Large
  • Trademark: dubang
  • Specification: SGS
Product Description

Product Description

Specifications;
1.     Aluzinc coating mass: 30g-275g/sqm
2.     Coil weight:4-6 tons per coil
3.     Edge treatment: Mill edge or cut edge. 
4.     Technical treatment: Bright annealed, flatting, cold harden.
5.     Surface treatment: Annealed, bright finish, dull/bright finish, slit edge. 
6.     Spangle: Normal/small/big/zero spangle. 
7.     Delivery terms: FOB / C&R / CIF 
8.     Supply Ability: 30000MT/month
9.     Application: The construction industry: The roof structure, keel, grill, Clapboard, ceilings, fire shutter doors, etc; The light industry, the Automobile, agriculture, animal husbandry, fishery, casing of household Electronic application, civilian smoke stack, etc. 
10.   Delivery time: Within 30 days after the receipt of L/C or Signed the contract or according to customer's requirement. 
Special design available according to requirement; Anti-corrosion And high-temperature resistant with black painting; All the production process Are made under the ISO9001: 2000 strictly
Send your message to this supplier
Avatar
Miss lansing
*From:
To: Miss lansing
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now